SRCO Rabak 100 000 Ton Grain Depot Sudan
The Project situates at Rabak (White Nile State), some 300km south of Khartoum, consists of 10 concrete silos. Consisting of 10 concrete silos and related auxiliary facilities, the cylinder structure adopts the sliding formwork process, which is the largest sliding formwork construction in Sudan.
Building area:11000㎡ Concrete volume: 15000m³